It seems that, I have not updated the blog for nearly five months. From about July to December each year, there are a lot of wood pellets in bulk loaded on the East Coast of U.S. We are in charge of most of the vessels that load this cargo in Chesapeake, Virginia, Wilmington, North Carolina, Panama City, Florida and Savannah, Georgia.
From about early July to early November last year, I kept shuttling between Chesapeake and Wilmington. I was in charge to see the vessel pass the Hold cleanliness inspection and thereafter load maximum cargo the vessel could carry, considering stability parameters and draft restrictions.
The above is not an excuse for being away from the blog, but the type of work I was involved in, has a major role to play in that.
No comments:
Post a Comment